Extracts of References
|
Concrete repair |
|
|---|---|
| 2010/2011 | Concrete repair and increase of the concrete cover with shotcrete on the MESSMA Lofts construction project in Magdeburg |
| 2010/2011 | Increased bearing capacity of floor slabs and beams with CFRP plates at the House of Archaeology in Chemnitz |
| 2010 | Repairs to two railway bridges in Zeven with shotcrete |
| 2010 | Basement parking garage Denkendorf, concrete repairs after fire damage |
| 2009/2010 | Pöhl dam, the smaller Thoßfell “pre-dam”, repairs to the above and below the waterline with reinforced shotcrete |
| 2009 | State of Criminal Investigation Erfurt Concrete Reconstruction |
| 2009 | Preten Schöpfwerke Neu Sude Concrete Reconstruction |
| 2008/2009 |
Munition depot Strengthening of columns/beams with Shot crete |
| 2007 | Tunnel repair, Bildvasen tunnel |
| 2006 | Tunnel repair, Hochdorfer tunnel |
| 2006 / 2009 |
Bad Neuenahr / Ahrweiler Repair of undersid and foundation structures of the Ahrtal bridge |
| 2007 / 2008 |
Erkrath, railway overpasses |
| 2007 / 2008 | Deuna cement works Repair of clinker silo with steel-fibre shotcrete |
| 2007 | Halle/Saale, Hotel Europa, repair of fire damage in underground car park |
| 2005 / 2006 | water engineering-repair works, Bamberg and Eilbach locks |
| 2005 / 2006 | water engineering-repair works, Elevator shaft, Remagen |
| 2002 / 2007 | Weida dam Masonry repair on cascade and saddle bridge |
| 2003 / 2007 | Pöhl dam Repair of flood relief installations, power station ceiling, water exchange zone and air side |
| 2006 | A3 und A46 motorways near Hilden intersection Repair of 3 bridge undersid with SPCC and OS system |
| 2006 | Bleiloch dam Concrete repair of water exchange zone |
| 2005 | Mühlenmeisse bridge, Hodenhagen through-road Improvement of load-bearing capacity with CFRP plates |
|
Steel repairs |
|
|---|---|
| 2010/2011 | Bruchweg Stadium Mainz, repairs and reinforcements to the steel structure of the grandstand roof |
| 2010/2011 | Rhine River Bridge Duisburg-Neuenkamp BAB A 40 (BAB = motorway) Superstructure repairs, repair of cracks and welded seams |
| 2010/2011 | Rhine River Bridge Leverkusen BAB A 1 Reinforcement of superstructure |
| 2007/2011 |
THE SQUAIRE FRANKFURT Upgrading of fish-bellied girders and repair and reinforcement of welded seams
|
| 2009 | A13 Berlin-Dresden,Amplifying BW 62,63,65 and Protection BW 64 |
| 2009 | Rhine bridge Karlsruhe - Maxau B10, Weldseam clearance |
| 2007 / 2008 |
Leverkusen, repair of Willy-Brandt-Ring railway overpass |
| 2004 - 2007 | Rhine bridge, Düsseldorf / Neuss Strengthening of river and flood bridge, installation of inspection carriages and monitoring jetties |
| 2004 | A7 motorway, Sinntal bridge Repair of weld seams |
| 2003 / 2006 |
A3 motorway, Haseltal bridge Repair of weld seams and improvement of load-bearing capacity |
| 2001 | Bornaische bridge in Leipzig Repair and improvement of load-bearing capacity |
| 2002 / 2003 | A60 motorway, Rhine bridge near Mainz-Weisenau Widening and repair of river and shore bridge |